Commit Graph
3 Commits
Author SHA1 Message Date
WorkBuddy 8dee67040c fix(miniapp): 幂等键改为按操作稳定;删除指向 404 的互选死代码
1) 幂等键(配合后端机制)

原写法把 Date.now() 拼进幂等键,每次调用都生成新键,即使后端实现了幂等
也永远不会命中 —— 声明端与实现端各自都坏。

api.idempotencyKey(scope, subject):键缓存在 _pendingIdempotency(TTL 10min),
同一逻辑操作在成功之前复用同一把键,收到 200+success 才释放;失败(含网络错误)
不释放,下次重试沿用同一把键。25 处调用点(8 个 service + 2 个 TS 页面)全部替换,
Date.now 幂等键写法残留经 grep 为 0。

2) 删除死代码 submitInterests

它请求 POST /activities/{id}/interests —— 后端从未实现该端点
(Phase 16 已把表达意向合并进 /activities/{id}/feedback 的
interestTargetUserIds)。全仓确认无任何页面/组件调用方。
两个文件各留注释说明删除原因与恢复条件:若产品确认需要独立的
「提交互选」端点,应先定义语义并补后端实现,再恢复前端方法。

store 头部关于 AGENTS 第 6 条(单向意向保密)的注释同步改为引用
submitFeedback 返回的 newMutuals。
2026-09-18 16:37:33 +08:00
WorkBuddy 29112eed6e fix(activity): close Phase 15 KEEP-VERIFY/EXTEND — 2 critical + 14 other defects, 3 test-fidelity fixes
Phase 15 (activity registration / review / checkin) verification closure.

Two CRITICAL defects, both "production always had it, test schema never did":
- D1: generateCheckinToken wrote the token to Redis with value "used", while
  scanCheckin rejects any token marked "used" -> every freshly issued check-in
  code was dead on arrival, staff scanning failed 100% of the time.
  Issuing now writes "issued"; "used" is set only after a successful scan.
- D9: UNIQUE(activity_id, user_id) exists in production, but re-registering
  after cancel/reject went through INSERT -> users who cancelled once could
  never register for that activity again (duplicate key 500). The H2 test
  schema lacked the UNIQUE, so the path had zero coverage. Now the original
  row is reused via an atomic conditional UPDATE.

Checkin (D2-D8):
- D2: duplicate check-in was read-then-write; now atomic checkinIfNotCheckedIn
  and repeat scans are idempotent (alreadyCheckedIn) without duplicate audit.
- D3: no data scope at all -> added activity staff assignment (V040) and
  assertCheckinScope; INV-020 (org relation grants nothing).
- D4: manualCheckin did not validate activity existence/cancellation.
- D5: getCheckinStats NPE on missing activity; remainingCount was semantically
  "free seats" -> replaced with notCheckedInCount.
- D6: malformed timestamp caused 500 -> 400. D7: constant-time signature compare.

Registration / review / cancel (D10-D13):
- D10: backend registration list only queried status='approved' -> the review
  screen never saw pending rows (review unusable).
- D11: registration_start_at / registration_end_at were never enforced.
- D12: cancel had no audit log (the only write without one).
- D13: reject/cancel were read-then-full-update -> rejectIfPending/cancelIfActive.

Capacity groups (D14, plan item 2): groups were stored and read back but never
participated in capacity -> incrementIfAvailable / decrementIfPositive now make
approved_count real; activities without groups are unaffected.

Frontend contract (F1-F2):
- F1: admin-web had no check-in surface at all -> ActivityCheckinView.vue
  (paste/scan token, manual check-in, stats) + /activities/checkin route & nav.
- F2: miniapp had no cancel-registration wrapper although the endpoint existed.

Test fidelity (T1-T3):
- T1: test schema gained UNIQUE(activity_id,user_id) + chk_reg_status +
  chk_checkin_status; two new guards parse the real V010 DDL and compare.
- T2: 3 assertTrue(true) placeholders in CheckinServiceTest (covering duplicate
  check-in, expiry, no-sensitive-plaintext) replaced with 5 real guards that
  parse the real source and real production DDL.
- T3: activity_registrations + activity_staff_assignments moved into
  REQUIRED_IN_TEST_SCHEMA; MigrationValidationTest baseline 39 -> 40.

Note: ActivityStaffAssignment must NOT extend BaseEntity - the table is a
composite PK (activity_id, operator_id); BaseEntity would add id/updated_at/
deleted_at to every INSERT and break on PostgreSQL (caught by
EntityMigrationParityTest immediately).

Tests: ActivityPhase15Test (21), CheckinServiceTest (5), 2 new constraint
guards. Negative verification: 3 injected defects -> 8 assertions turned red,
all restored.

Regression: 474 tests / 0 failures / 0 errors / 3 skipped / BUILD SUCCESS
(baseline 450). admin-web vue-tsc 0 error, vite build OK.
2026-09-17 15:07:52 +08:00
admin b46b48eb33 chore: establish V1.1 recovery baseline 2026-09-09 22:05:00 +08:00